We are pretty close to having a complete floor again. We got things pretty dried up and Vic sprayed down all the joists with both a mold killer and and a mold inhibitor paint. I pulled up almost all the remaining laminate flooring and started peeling off the metal backsplash. We made a quick trip to Menards and got plywood for the floor, a new valve to fix the water leak, and the paint he wanted for the floor joists. My main job this weekend for this project is to get everything else out of the kitchen. I have to empty the rest of the cupboards and drawers, and move all moveable items. This is so we can cut up and remove the rest of the linoleum flooring and so he can take down the popcorn ceiling. I assume that will happen while I am gone next week. I have to basically turn my living/dining room area into the storage area for the kitchen items. The rest will either go in the trash or into the spare room. I plan on grabbing a couple of new totes today so that I can empty cu...