Well, we finally got the quote back from the builder today. Needless to say, either we were far too optimistic or Vic wasn't forthright with him about our financial limitations. The bid (for very basic services) came in about ten thousand more than what our home value will likely allow for the project to happen. This was a quote for an unfinished pole barn with concrete floor and unfinished 10 x 10 breezeway with concrete floor. That's it. No drywall, insulation, electric, nothing. Vic was estimating a price of $12-$15k with it being such a basic build. Instead, the bid was over $29k.
I'm not sure what happens next. I don't know if we call our loan officer and call the whole thing off or get competitive bids or what. The loan officer wasn't optimistic about us getting financed for anything over 20k and even that, she thought, was being optimistic. I am fairly certain that there's no way in hell the bank will give us 29k for this project.
So, now I'm pretty let down. I actually feel like if we turn this bid in, they are going to literally laugh in our faces. It would be a huge waste of time. Vic was just as blown away by the bid as I was. I guess we have to reevaluate our plan.
I'm not sure what happens next. I don't know if we call our loan officer and call the whole thing off or get competitive bids or what. The loan officer wasn't optimistic about us getting financed for anything over 20k and even that, she thought, was being optimistic. I am fairly certain that there's no way in hell the bank will give us 29k for this project.
So, now I'm pretty let down. I actually feel like if we turn this bid in, they are going to literally laugh in our faces. It would be a huge waste of time. Vic was just as blown away by the bid as I was. I guess we have to reevaluate our plan.
Comments
Post a Comment